Needs
Januray 2012 – Needs LIST:
*Flooring – The baby home currently has concrete flooring. Carpeting and tiling are needed to complete the flooring throughout. (Cost: TBD)
*Guest House – The guest house will be the primary location for families to stay at while going through the adoption process. It is about half-way finished with an approximate cost of $10 to finish it. (Cost: Approx. $10k)
* Guest House Furniture/Fixtures (Cost: $5k)
* Vehicle (Cost: $3-5K) This may be the most important need since we need to transport the babies to the doctors sometimes for emergencies and right now we have to wait for a driver.